Posts

Showing posts from December, 2022

Location Risk Analysis

We had an adult drive us to the various sites for our automobile scene and shot, and we also needed their assistance for the car accident shot. Adult present when shooting on the field.

Preliminary Task: Shoot :Day 3

Image
 On 3rd Day of shoot , as we were done and finished with the rest of the filming, our last task was to film the lip-sync part for the project. We had taken permission from school  to film in one of the class rooms in low light with the use of our black screen 

Preliminary Task: Shoot : Day 2

Image
  Day 2 of shoot we planned to film on the field or plain sight which does work as important aspect for our project

Preliminary Task: Shoot :Day 1

Image
Day 1 of shoot we had both the brothers doing things together and hanging out. We had an adult with us to drive us to different locations and help with transferring equipment

Story board

Image
 This is our initiate story board created before official shoot day 

Equipment used

We used different sort of equipment required for each location setting but all are included below Tripod Camera D-3300 Nikon Dji